On 12 January 2026, ISRO's PSLV-C62 lifted off from the Satish Dhawan Space Centre at Sriharikota carrying a set of small payloads alongside its main mission. One of them, a thermal sensor payload called SBB-1, had been designed and built by 17 students aged 12 to 16 from Blue Blocks Montessori School in Hyderabad. Minutes into the flight, the rocket's third stage suffered an anomaly, and all of the payloads on board were lost.What remains of…